Tentang Xingxu Kangda

Fokus pada teknologi picagari keselamatan boleh tarik

Shaanxi Xingxukangda Medical Technology membangun dan mengeluarkan picagari keselamatan steril boleh tarik serta penyelesaian automasi berkaitan.

杏旭康达 XINGXU KANGDA

Profil syarikat

Keupayaan pembuatan di sebalik setiap produk

Xingxu Medical Devices (Suzhou) ditubuhkan pada 2016. Operasi pembuatan ditubuhkan di Lintong, Shaanxi pada 2023 untuk pembangunan dan pengeluaran picagari keselamatan.

Operasi merangkumi R&D, acuan tepat, pemasangan automatik, reka bentuk proses bersih dan bekalan B2B antarabangsa.

2016Operasi Suzhou ditubuhkan
2023Kilang Shaanxi ditubuhkan
2026Kerjasama B2B global

Integrated company scope

Product, tooling and automation developed around one safety platform

Xingxu Kangda brings several connected capabilities together around retractable safety syringe development and manufacturing.

01

Product development

Product structures are developed around controlled manual needle retraction and single-use disablement.

02

Precision tooling

Mold development supports the geometry and repeatability required by syringe components.

03

Automation engineering

Assembly equipment and process design connect product development with scalable manufacturing.

04

International B2B support

Product information, videos and available documents support distributor and institutional evaluation.

Working principles

A professional basis for long-term B2B communication

The company profile is strengthened by showing how technical and commercial discussions are approached.

01

Be specific

Product conversations begin with structure, capacity, needle specification and intended market.

02

Show the evidence

Available product videos, certificates and patent documents are presented for direct review.

03

Keep communication direct

Buyers can reach the product team through the inquiry form, email or WhatsApp.

Public records in China

Company development reflected in public sources

The following milestones link to Chinese corporate, media and regulatory records. Planned capacity and project figures are presented as reported at the time, not as current supply commitments.

WA